首页> 外文期刊>Engineering news-record >Runway Expansion Requires 12,000 Tons of Reinforced Steel
【24h】

Runway Expansion Requires 12,000 Tons of Reinforced Steel

机译:跑道扩张需要12,000吨钢筋

获取原文
获取原文并翻译 | 示例
       

摘要

Gerdau is supplying more than 12,000 tons of reinforcing steel for a $791-million runway expansion at the Fort Lauderdale-Hollywood International Airport in Broward County, Fla., one of the fastest-growing airports in the nation. The south runway will be widened from 100 ft to 150 ft and lengthened from 5,276 ft to 8,000 ft, providing space for two parallel runways than can accommodate 27% more flights. The impressive design includes a gradually rising slope toward the east, reaching a six-story height that is supported by a retaining wall.
机译:Gerdau正在为佛罗里达州布劳沃德县劳德代尔堡-好莱坞国际机场(该州增长最快的机场之一)进行7.91亿美元的跑道扩展,提供超过12,000吨钢筋。南跑道将从100英尺扩大到150英尺,从5276英尺延长到8000英尺,为两条平行跑道提供空间,而不能容纳多27%的飞行。令人印象深刻的设计包括向东逐渐上升的斜坡,达到六层高,并由挡土墙支撑。

著录项

  • 来源
    《Engineering news-record》 |2013年第14期|S12-S12|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号