首页> 外文期刊>Engineering news-record >Plan To Repair Broken Bay Bridge Bolts Based Upon Custom Steel Saddles
【24h】

Plan To Repair Broken Bay Bridge Bolts Based Upon Custom Steel Saddles

机译:计划根据定制钢制马鞍修理折断的海湾大桥螺栓

获取原文
获取原文并翻译 | 示例
       

摘要

The Toll Bridge Program Oversight Committee, or TBPOC, says it has a plan in place to fix broken bolts on the $6.4-billion San Francisco-Oakland Bay Bridge project. It was revealed in March that 32 of the 96 anchor bolt rods on the structure's eastern span broke when crews tightened them. The plan calls for the installation of custom-made steel saddles with hundreds of post-tension wires encased in concrete over two shear keys attached to the rods. TBPOC and main contractor American Bridge-Fluor Joint Venture say an equivalent amount of clamping force as the original bolt design's can be attained to hold down the shear keys.
机译:收费桥计划监督委员会(TBPOC)表示,它已经制定了计划,以修复价值64亿美元的旧金山-奥克兰湾大桥项目中的断螺栓。 3月发现,当机组拧紧时,结构东部跨度的96根锚杆中有32根断裂。该计划要求安装定制的钢制鞍座,将数百根后张拉线包裹在混凝土中,并在与杆相连的两个剪切键上进行包裹。 TBPOC和主要承包商美国桥梁与地板合资公司(American Bridge-Fluor Joint Venture)表示,可以保持与原始螺栓设计相当的夹持力来压下剪切键。

著录项

  • 来源
    《Engineering news-record》 |2013年第14期|15-15|共1页
  • 作者

    Greg Aragon;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:34

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号