首页> 外文期刊>Engineering news-record >City, Operator Dropped From Treatment Plant Fatality Suit
【24h】

City, Operator Dropped From Treatment Plant Fatality Suit

机译:城市,操作员从污水处理厂死亡诉讼中撤离

获取原文
获取原文并翻译 | 示例
       

摘要

The city of Gatlinburg, Term., and the company that runs its wastewater treatment plant have been dismissed from lawsuits stemming from the deaths of two workers when a wall collapsed. However, charges are proceeding against the plant's contractor and engineer. A jury trial is scheduled for June 2015. John Eslinger, 53, lead operator, and Donald Storey, 44, operator, were killed in April 2011, when the 40-ft equalization-tank wall collapsed onto the flow-control building where they were working, dumping over 2 million gallons of raw sewage into the Little Pigeon River.
机译:Term盖特林堡市以及经营其废水处理厂的公司已因两名工人因墙倒塌而死亡的诉讼而被解雇。但是,正在对工厂的承包商和工程师提起诉讼。计划于2015年6月进行陪审团审判。2011年4月,现年53岁的首席操作员John Eslinger和现年44岁的Donald Storey被杀,当时40英尺的均衡水箱墙倒塌到了他们当时所在的流量控制大楼。工作,将超过200万加仑的污水排入小鸽子河。

著录项

  • 来源
    《Engineering news-record》 |2014年第16期|16-16|共1页
  • 作者

    Candy McCampbell;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:14

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号