首页> 外文期刊>Engineering news-record >LESSONS LEARNED ON THE BAY BRIDGE
【24h】

LESSONS LEARNED ON THE BAY BRIDGE

机译:在海湾大桥上学习的经验教训

获取原文
获取原文并翻译 | 示例
       

摘要

A lengthy delay mandated by the governor, a rebid and a fierce debate over the design of the new San Francisco-Oakland Bay Bridge were just the beginning. Over the course of the 11-year construction period came allegations, faulty rods, foundation questions and even an FBI investigation on the $6.4-billion crossing, which was completed last year. "It was a once-in-a-lifetime opportunity," says Pat Lowry, president of Alta Vista, which received its fair share of public scrutiny as the provider of inspections and materials testing. "At the end of the day, when you drive across that bridge that you worked on, nobody will ever be able to take that away from you."
机译:州长要求的漫长拖延,对新的旧金山-奥克兰湾大桥的设计进行的激烈讨论和激烈辩论只是开始。在为期11年的建设过程中,指控,错误的标尺,地基问题甚至FBI对这条64亿美元过境点的调查都已完成,该调查已于去年完成。 Alta Vista总裁Pat Lowry说:“这是千载难逢的机会。”作为检查和材料测试的提供者,Alta Vista得到了公众的广泛关注。 “归根结底,当您开车经过您曾经工作过的那座桥时,没人会把它从您身边夺走。”

著录项

  • 来源
    《Engineering news-record》 |2015年第5期|18-18|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号