首页> 外文期刊>Engineering news-record >New Self-Climbing Formwork Technology Increases Efficiency
【24h】

New Self-Climbing Formwork Technology Increases Efficiency

机译:新的自爬式模板技术提高了效率

获取原文
获取原文并翻译 | 示例
       

摘要

The core of Rosslyn, Va., is changing with the completion of Central Place, a mixed-use residential, retail and commercial development. When completed in 2017, the office tower will house Virginia's first public observation deck with amazing 360-degree views of the D.C. monuments and landmarks. The 33-story, 750,000-sq-ft structure features post tension and mild steel reinforced slabs with an 18-in.-thick transfer slab observation deck on the 31st floor. The project will use more than 64,000 cu yds of concrete.
机译:弗吉尼亚州罗斯林市的核心正在随着中央广场(Central Place)的竣工而发生变化,中央广场是住宅,零售和商业用途综合体。办公大楼于2017年完工后,将容纳弗吉尼亚州的第一个公共观景台,可欣赏华盛顿特区古迹和地标的惊人360度全景。这座33层,750,000平方英尺的结构具有后张拉力和低碳钢增强板,在31层设有18英寸厚的转移板观景台。该项目将使用超过64,000立方码的混凝土。

著录项

  • 来源
    《Engineering news-record》 |2016年第16期|42-42|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:27

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号