首页> 外文期刊>Engineering news-record >Demolition and Environmental Work
【24h】

Demolition and Environmental Work

机译:拆除与环境工作

获取原文
获取原文并翻译 | 示例
       

摘要

Based on the unique challenges of the work and its extensive experience with similar projects, Brandenburg Industrial Service Co. was selected to deconstruct Penn Tower. The structures included a 23-story, 300,000-sq-ft high-rise connected to a five-story, 250,000-sq-ft parking garage located in the economic heart of Philadelphia, with a population of more than 300,000 and adjacent to a major thoroughfare and rail station. Surrounding structures included the Children's Hospital of Philadelphia, the University of Pennsylvania Health System, and the Pennsylvania Museum of Archaeology and Anthropology.
机译:基于工作的独特挑战以及在类似项目中的广泛经验,勃兰登堡工业服务公司被选为对Penn Tower的解构。这些建筑包括一个23层,300,000平方英尺的高层建筑,与位于费城经济中心的5层,250,000平方英尺的车库相连,人口超过30万,与主要城市相邻。通道和火车站。周围的建筑包括费城儿童医院,宾夕法尼亚大学卫生系统以及宾夕法尼亚考古与人类学博物馆。

著录项

  • 来源
    《Engineering news-record》 |2016年第12期|38-38|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:23

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号