首页> 外文期刊>Engineering news-record >Dallas/Fort Worth International Airport Terminal A, Phase Ⅱ, Renewal and Improvement Program
【24h】

Dallas/Fort Worth International Airport Terminal A, Phase Ⅱ, Renewal and Improvement Program

机译:达拉斯/沃斯堡国际机场A航站楼,第二期,更新和改善计划

获取原文
获取原文并翻译 | 示例
       

摘要

In 2012, DFW International Airport moved to replace Terminal A's building system after the original system had reached the end of its service life. This project, which involved the installation of new, more efficient primary systems, incorporated innovative ideas for passenger processing, allowing DFWIA and airlines to adapt to rapid changes in technology and passenger demographics. With Balfour Beatty as managing partner, the BARC joint-venture team began the $140-million, 400,000-sq-ft project in May 2012 and completed work in December 2014.
机译:在原始系统的使用寿命到期后,2012年,DFW国际机场开始更换A航站楼的建筑系统。该项目涉及安装新的,更有效的主系统,并结合了旅客处理的创新思想,使DFWIA和航空公司能够适应技术和旅客人口统计的快速变化。 BARC合资团队由Balfour Beatty作为执行合伙人,于2012年5月启动了这个耗资1.4亿美元,占地40万平方英尺的项目,并于2014年12月完成了工作。

著录项

  • 来源
    《Engineering news-record》 |2016年第7期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号