首页> 外文期刊>Engineering news-record >Early Completion Achieved on Dugway West Interceptor Relief Sewer
【24h】

Early Completion Achieved on Dugway West Interceptor Relief Sewer

机译:Dugway West拦截器下水道的早期竣工

获取原文
获取原文并翻译 | 示例
       

摘要

Early completion of the Dugway West Interceptor Relief Sewer, amajor component of the Northeast Ohio Regional Sewer District's Project Clean Lake program in Cleveland, has been achieved by Walsh Construction. The Dugway West Interceptor Relief Sewer is part of a network of new sewers that will drastically reduce combined sewer overflows in Northeast Ohio. The project includes the installation of 14,000 ft of 108-in. to 24-in. sanitary sewer pipes that will capture and treat 110 million gals of sewage, reduce raw discharge into Lake Erie and allow a significant increase in accessibility to clean water.
机译:Walsh Construction已实现了Dugway West拦截器下水道的早期工程,该工程是俄亥俄州东北部地区下水道区克利夫兰项目Clean Lake计划的主要组成部分。 Dugway West拦截器泄放排污管道是新排污管道网络的一部分,该网络将大大减少俄亥俄州东北部的联合排污管道溢流。该项目包括安装14,000英尺的108英寸。至24英寸污水管将捕获和处理1.1亿加仑的污水,减少向伊利湖的原始排放,并显着增加清洁水的可及性。

著录项

  • 来源
    《Engineering news-record》 |2017年第14期|W12-W12|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:10:43

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号