首页> 外文期刊>Engineering news-record >GILBANE PROJECT EXEC COMPLETES HIS MISSION AGAINST THE ODDS
【24h】

GILBANE PROJECT EXEC COMPLETES HIS MISSION AGAINST THE ODDS

机译:Gilbane项目执行了针对ODDS的任务

获取原文
获取原文并翻译 | 示例
       

摘要

Afghanistan's new Ministry of Defense headquarters in Kabul was supposed to symbolize the nation's future-and U.S. support in that effort-as a self-sustaining, sophisticated structure akin to the Pentagon. But U.S. funding shortfalls stretched an anticipated 18-month project, which began in 2009, into years. While experienced in running projects in an underdeveloped country in which terror attacks and unstable regional politics are routine, Gilbane Building Co. Project Executive Michael P. Sousa wanted no part of this one in 2013, when he first toured it. "The structure was in a severe state of disrepair and riddled with poor construction," he says, terming it "an embarrassment" to the U.S. government.
机译:阿富汗国防部在喀布尔的新总部应该象征着该国的未来,也是美国在这一努力中的支持,它是一种类似于五角大楼的自我维持的,复杂的结构。但是美国的资金短缺将预计于2009年开始的为期18个月的项目延长了数年之久。 Gilbane Building Co.项目执行官Michael P. Sousa曾在一个经常发生恐怖袭击和不稳定地区政治的不发达国家进行项目运营的经验,但在2013年首次参观该项目时,他并不想参与其中。他说:“该建筑处于严重的失修状态,而且建筑质量差。”他称这对美国政府来说是“尴尬”。

著录项

  • 来源
    《Engineering news-record》 |2017年第2期|39-39|共1页
  • 作者

    Debra K. Rubin;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:10:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号