首页> 外文期刊>Engineering news-record >Giant Nuke Waste 'Vit' Plant Hits Initial Building Deadline
【24h】

Giant Nuke Waste 'Vit' Plant Hits Initial Building Deadline

机译:巨型核武器废物'Vit'植物击中初始建筑截止日期

获取原文
获取原文并翻译 | 示例
           

摘要

Nearly two decades after design and construction began on what became a $17-billion complex to immobilize 56 million gallons of nuclear and chemical wastes at the U.S. Energy Dept. Hanford former weapons site in Washington state, work has largely finished on a facility to treat the least contaminated but largest volume of wastes to meet a cleanup deadline. Construction completion by Bechtel National moves a key part of the Tank Waste Treatment and Immobilization Plant into start-up testing, including permanently firing the first of two 300-ton melters this year in a "vitrification" process that will turn nuclear and chemical wastes into glass logs for permanent onsite burial. Building what is said to be the world's largest plant to treat nuclear waste "is truly a scientific and engineering feat," said Sen. Maria Cantwell (D-Wash).
机译:设计和建设近二十年开始达到170亿美元的复杂,以固定5600万加仑核和化学废物在华盛顿州的汉福德前武器网站,工作在很大程度上在待遇的设施最不受污染但最大的废物量,以满足清理截止日期。 Bechtel National的施工完成将坦克废物处理和固定工厂的关键部分移动到启动测试中,包括今年在“玻璃化”过程中永久地射击两吨300吨熔炉,将核和化学废物转化为玻璃日志为永久现场埋葬。建立据说是世界上最大的植物治疗核废料“是真正的科学和工程的壮举,”参议员玛丽亚康斯威尔(D-Wash)说。

著录项

  • 来源
    《Engineering news-record》 |2021年第2期|16-16|共1页
  • 作者

    Tim Newcomb;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号