【24h】

Pulse

机译:脉冲

获取原文
获取原文并翻译 | 示例
       

摘要

NEVADA The Clark County Water Reclamation District is planning to upgrade the Flamingo Water Resource Center. The project entails constructing three aeration basins, three 140-ft-dia clarifiers with 16-ft side water depth, a blower/electrical building with electrical feed and four blowers and a return activated sludge/waste activated sludge pump station with five RAS pumps, five WAS pumps and four scum pumps. At the outlet, a 96-in.-dia pipe approximately 3,000 ft long will connect to the existing secondary effluent structure. Sletten Construction Co. is the construction manager at-risk. The project is valued at between $123 million and $143 million. Clark County Water Reclamation District, Attn: Larry Silver, Capital Projects, 5857 E. Flamingo Road, Las Vegas, 89122. DR#20-00S60862.
机译:内华达州克拉克县水填海区正在计划升级火烈鸟水资源中心。该项目需要构建三个曝气盆,三个140-FT-DIA澄清器,具有16英尺的侧面水深,鼓风机/电气建筑,带有电饲料和四个鼓风机和返回活性污泥/废物活化污泥泵站,具有五个RAS泵,五是泵和四个浮渣泵。在出口处,96 in.-dia管大约3,000英尺长的管道将连接到现有的二级流出结构。斜纹建设有限公司是施工经理风险。该项目的价值在1.23亿美元至1.43亿美元之间。克拉克县水回收区,attn:拉里银,资本项目,5857 E.Flamingo Road,拉斯维加斯,89122。DR#20-00S60862。

著录项

  • 来源
    《Engineering news-record》 |2020年第7期|44-44|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 23:02:08

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号