...
首页> 外文期刊>Engineering news-record >Big GE Haliade-X Turbine Blade Starts Fatigue Tests in Boston
【24h】

Big GE Haliade-X Turbine Blade Starts Fatigue Tests in Boston

机译:Big Ge Haliade-X涡轮机刀片在波士顿开始疲劳试验

获取原文
获取原文并翻译 | 示例

摘要

Aimed for the first commercial deployment in the U.S. by 2021, the giant GE Haliade-X 12-MW offshore wind turbine has arrived at the Massachusetts Clean Energy Center in Boston for blade testing. The 351-ft-long blade will undergo months of fatigue tests to confirm that it can withstand more than 25 years of operation at sea. "The center will use bridge cranes to move the blade and servo-hydraulic ac- tuators for fatigue testing," says a center spokesman. Turbine maker GE Renew-able Energy recently said that leading Danish offshore wind developer Orsted chose Haliade-X to power planned projects in New Jersey and Maryland, and developer Equinor-SSE will use it for the U.K.-based 3.6-GW Dogger Bank wind farm—set to be the world's largest offshore project when it completes. GE Renewable Energy says it has contracted the Haliade-X for nearly 5 GW of offshore wind project capacity globally. Haliade-X currendy is manufactured only in France.
机译:旨在为2021年的第一次商业部署,巨型GE Haliade-X 12-MW海上风力涡轮机已经到达Massachusetts在波士顿的清洁能源中心进行刀片测试。 351英尺长的刀片将接受几个月的疲劳试验,以确认它可以承受超过25年的海上运行。 “该中心将使用桥式起重机移动刀片和伺服液压分子,以便进行疲劳测试,”中心发言人说。 Turbine Maker GE更新能源最近表示,领先的丹麦海上风开发商奥斯特德选择了HaliaDe-X在新泽西州和马里兰州的电力计划项目,而开发商Equinor-SSE将为英国3.6-GW Dogger Bank Wind Farm使用它 - 在完成时成为世界上最大的离岸项目。 GE可再生能源表示,它已在全球签订了Haliade-X的近5 GW的海上风力项目能力。 Haliade-X Currendy仅在法国制造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号