首页> 外文期刊>Engineering news-record >Detail and Determination Safely Bring Down a Dozen Buildings in Las Vegas Casino Complex
【24h】

Detail and Determination Safely Bring Down a Dozen Buildings in Las Vegas Casino Complex

机译:细节和决心安全地在拉斯维加斯赌场综合体的十几栋建筑物

获取原文
获取原文并翻译 | 示例
       

摘要

Deconstruction of more than half a million square feet of commercial and entertainment space on Freemont Street in Las Vegas was accomplished by North American Dismantling Corp. as a subcontractor to Tre Builders. Demolition included various one- to three-story structures, a seven-story parking garage and north and south office towers, which stood 15 and 14 stories, respectively, to make way for the first new casino resort to be constructed downtown in decades.
机译:Las Vegas弗里蒙斯街上的超过五百万平方英尺的商业和娱乐空间是由北美拆除公司完成的。作为Tre Builders的分包商。拆迁包括各种三层结构,七层停车库和南路办公楼,分别为15至14个故事,为几十年来建造市中心的第一个新赌场度假胜地。

著录项

  • 来源
    《Engineering news-record》 |2019年第9期|90-90|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 22:30:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号