首页> 外文期刊>Engineering news-record >Nebraska Flood Shows Weak Points
【24h】

Nebraska Flood Shows Weak Points

机译:内布拉斯加州洪水显示薄弱点

获取原文
获取原文并翻译 | 示例
       

摘要

Officials from the U.S. Army Corps of Engineers, the Nebraska Dept. of Natural Resources, the state's biggest public power utility and local fire departments were all overwhelmed by a combination of frozen ground, rain and snow in mid-March. The Platte and Missouri river systems could not drain the inundation, and it didn't help that much of the infrastructure in place wasn't ready for such a combined storm and cold event. "The snow amount and the rainfall totals were not uncommon; what was uncommon for us was that one happened on top of the other," says Tim Gokie, dam safety chief for the Nebraska Dept. of Natural Resources (NDNR), the state agency in charge of inspecting the state's 2,924 dams.
机译:来自美国陆军工程兵团的官员,内布拉斯加州自然资源部,该国最大的公共电力公用事业和当地的消防部门都被3月中旬的冰冻地面,雨和雪结合所淹没。 Platte和密苏里河系统无法排除淹没,并且没有帮助那种基础设施的大部分基础设施都没有准备好这样的综合风暴和冷酷事件。 “雪数量和降雨量总计并不罕见;对于我们而言,我们罕见的是,内布拉斯加州国家机构的内布拉斯加州部门大坝安全司司长负责检查国家的2,924个水坝。

著录项

  • 来源
    《Engineering news-record》 |2019年第7期|6-7|共2页
  • 作者

    Jeff Yoders;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 22:30:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号