首页> 外文期刊>Engineering news-record >Double Casing Helps Keep BART Tunnel Structures Safe and Operational
【24h】

Double Casing Helps Keep BART Tunnel Structures Safe and Operational

机译:双层套管有助于确保BART隧道结构的安全和运行

获取原文
获取原文并翻译 | 示例
       

摘要

Each year, approximately 126 million trips are made on the Bay Area Rapid Transit (BART) system, which has served the San Francisco Bay area since 1972. To keep its tunnel structures safe and operational, BART has established certain guidelines for new construction within its proximity. One of the guidelines requires that permanent building loads be transferred below the BART "zone of influence" (ZOI) or "no-load zone," defined as the area above a line from the bottom of the tunnel at a slope of 1.5H:1V to the foundation element.
机译:自1972年以来,每年约有1.26亿人次乘坐湾区捷运系统(BART),该系统已为旧金山湾区提供服务。为了保持其隧道结构的安全和可操作性,BART已为其内的新建筑建立了某些准则接近。准则之一要求永久性建筑荷载转移到BART的“影响区”(ZOI)或“空载区”以下,该区域定义为从隧道底部以1.5H的斜率到直线上方的区域: 1V至基础元件。

著录项

  • 来源
    《Engineering news-record》 |2020年第4期|48-48|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 05:03:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号