首页> 外文期刊>Engineering news-record >Technology Helps Build Largest P3 Student Housing Project to Date
【24h】

Technology Helps Build Largest P3 Student Housing Project to Date

机译:技术帮助建设迄今为止最大的P3学生住房项目

获取原文
获取原文并翻译 | 示例
           

摘要

In summer 2017, one week ahead of schedule, The Weitz Co. completed Park West, a 50-acre, 3,406-bed student housing community at Texas A&M University in College Station, Texas. Weitz's success was aided in no small measure by a suite of BIM technologies, in particular Bluebeam Revu. At one point during construction, there were more than 1,500 people working simultaneously on the project, which was spread over 15 buildings and 70 acres. Greg Martin, senior manager of operational excellence at Weitz, knew that on a site of this scale, even something as simple as physical orientation-let alone communication- would require innovation and experimentation.
机译:在2017年夏季,比原定计划提前一周,Weitz Co.在得克萨斯州大学城的得克萨斯州A&M大学完成了50英亩,3406张床的学生公寓社区。一系列BIM技术(尤其是Bluebeam Revu)极大地帮助了Weitz的成功。在施工过程中的某一时刻,有1,500多人同时从事该项目,该项目分布在15座建筑物和70英亩的土地上。魏茨(Weitz)卓越运营的高级经理格雷格·马丁(Greg Martin)知道,在如此规模的站点上,即使像物理定向这样简单的事情(更不用说交流)也需要创新和试验。

著录项

  • 来源
    《Engineering news-record》 |2018年第10期|34-34|共1页
  • 作者

    Ross Ufberg;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号