首页> 外文期刊>Engineering news-record >After the Tragic Accident
【24h】

After the Tragic Accident

机译:悲剧性事故后

获取原文
获取原文并翻译 | 示例
       

摘要

The tragedy in Sweetwater, Fla., at Florida International University, where a pedestrian bridge under construction collapsed onto motorists, brought immediate responses both from ENR's editors and writers, who rushed to provide coverage, and from attentive readers c ENR.com, some of whom speculated about what had happened.1. Michael L: If the final structure needed the cables to hold up the bridge platform, how can the platform be placed post-and-lintel style without the cable attachments? The tower hadn't been built yet, so it was apparently planned to be cable-free for a while.2. Richard Meyer: As a practicing private civil engineer, I have never been a proponent of the design-build process. This process can subject the engineer to make inappropriate decisions to [benefit] the contractor's profit line. It also removes the engineer from one of the most important components of the design process, which is a direct line of communication with the project owner.
机译:佛罗里达国际大学佛罗里达州斯威特沃特市的悲剧,正在修建的人行天桥倒塌,导致驾车者迅速受到ENR的编辑和作家的迅速反应,他们急忙提供报道,而殷勤的读者c ENR.com也对此做出了回应。他们猜测发生了什么。 r n1。迈克尔·L:如果最终的结构需要电缆来支撑桥平台,那么如何在没有电缆附件的情况下将平台放置成柱lin式呢?该塔尚未建造,因此显然已计划暂时不用电缆。 r n2。理查德·迈耶(Richard Meyer):作为一名执业的私人土木工程师,我从来没有支持过设计建造过程。此过程可能会使工程师做出不恰当的决定,从而[有益]承包商的利润线。它还使工程师脱离了设计过程中最重要的组成部分之一,而设计过程是与项目所有者进行直接沟通的渠道。

著录项

  • 来源
    《Engineering news-record》 |2018年第9期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:02:01

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号