首页> 外文期刊>Engineering news-record >No New Contract as Michigan Road Project Standoff Ends
【24h】

No New Contract as Michigan Road Project Standoff Ends

机译:由于密歇根公路项目对峙结束,没有新合同

获取原文
获取原文并翻译 | 示例
       

摘要

Road projects across Michigan that were stopped Sept. 4 due to a labor impasse resumed Sept. 28 as the two sides agreed to return to work with an agreement to negotiate a new contract this winter and work under the terms of a deal that expired in June until a new agreement can be reached. Gov. Rick Snyder (R) met with the Michigan Infrastructure and Transportation Association and the Operating Engineers Local 324 last week, and the agreement to renew work was announced Sept. 27. MITA will allow operating engineers on more than 160 road projects and contractors to return to their projects. OE Local 324 agreed to professional mediation through the winter to help with negotiation of new contracts.
机译:由于劳资僵局,密歇根州的公路项目于9月4日停止运营,双方于9月28日恢复工作并达成协议,双方将在今年冬天就新合同进行谈判,并根据6月份到期的交易条款开展工作直到达成新协议。州长里克·斯奈德(R)上周与密歇根州基础设施和运输协会以及地方工程师324会面,并于9月27日宣布了续签工作的协议。MITA将允许160多个道路项目和承包商的营运工程师进行回到他们的项目。 OE Local 324同意在整个冬季进行专业调解,以帮助谈判新合同。

著录项

  • 来源
    《Engineering news-record》 |2018年第9期|14-14|共1页
  • 作者

    Jeff Yoders;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:01:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号