首页> 外文期刊>Engineering news-record >Temporary Bridge-Jacking System Offers Access Solution
【24h】

Temporary Bridge-Jacking System Offers Access Solution

机译:临时架桥系统提供访问解决方案

获取原文
获取原文并翻译 | 示例
       

摘要

Providing cost-effective access to hard-to-reach places through its self-deploying bridge-jacking system, Deep South Crane and Rigging allows clients to build a 'bridge over a bridge' with a minimal footprint. Clients save money because they only need a forklift-they do not need a crane as used in traditional methods. This solves situations where an existing bridge is not strong enough to handle a super load and saves money on costly remediation or reroutes. They can also solve access issues on jobsites by crossing creeks, ditches or above-ground pipelines, saving time on the schedule, lowering cost on the project and simplifying installation.
机译:Deep South Crane and Rigging通过其自部署的桥式顶升系统提供经济高效的通达难以到达的地方的服务,使客户能够以最小的占地面积建造“桥上的桥”。客户省钱是因为他们只需要叉车,而他们不需要传统方法中使用的起重机。这解决了现有网桥的强度不足以应付超负荷的情况,并节省了昂贵的修复或重新布线费用。他们还可以通过穿越小河,沟渠或地上管道来解决工作现场的出入问题,从而节省计划时间,降低项目成本并简化安装。

著录项

  • 来源
    《Engineering news-record》 |2018年第10期|28-28|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:01:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号