...
【24h】

Snapped it...

机译:抢购它......

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

During the 10-year inspection of the boiler of'Sherpa' on the 12 1/4-inch gauge Fairbourne Railway (see page 23), it was noted that a number of studs were waisted. I took the decision to replace all of them since those that didn't need doing, didn't look fantastic either! While I was removing them I managed to snap one of the main steam pipe flange studs on the front tubeplate - you can see in the photo that there is a slight darker patch across the stud where it had been slowly cracking for some time, which is another reason to replace these at sensible intervals.
机译:在12个1/4英寸仪表Fairbourne铁路上的'sherpa'锅炉的10年期间(见第23页),有人指出,一些铆钉腰部。我决定取代所有这些,因为那些不需要做的人,也不看起来很棒!虽然我正在删除它们,但我设法将其中一个主蒸汽管法兰钉在前管板上 - 您可以在照片中看到,螺柱上有一个轻微的暗红色贴片,在其中一直缓慢地破裂,这是以明智的间隔替换这些的另一个原因。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号