...
首页> 外文期刊>Engineering construction & architectural management >Labor crew workspace analysis for prefabricated assemblies' installation: A 4D-BIM-based approach
【24h】

Labor crew workspace analysis for prefabricated assemblies' installation: A 4D-BIM-based approach

机译:预制组件安装的劳动人员工作空间分析:基于4D-BIM的方法

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Purpose - Construction industrialization is emerging in the construction industry, as a result, buildings with prefabricated assemblies are gaining more and more ground. In most situations, the prefabricated building assemblies are installed by labor crews manually. If some assemblies are ill-designed, clashes between labor crews' workspaces and them may occur, which will have bad effect on workers' productivity and even incur hazard. The purpose of this paper is to provide a 4D building information modeling (BIM) based approach to find potential workspace conflicts during the installation process of prefabricated building assemblies in the detailed design process so as to eliminate them in advance. Design/methodology/approach - First, a workspace modeling method is provided; second, three kinds of workspace conflicts are analyzed; third, a 4D-BIM-based approach is established; fourth, a prototype tool based on the approach is developed; and finally, a case study is conducted to test the tool. Findings - The result shows that the proposed tool can detect or precaution workspace conflicts and visualize them in a series of views; in doing so, valuable information can be obtained for improving the design quality of prefabricated assemblies. Research limitations/implications - The proposed approach and tool only concern the congestions caused by ill-designed prefabricated components; the tool needed to be further optimized for speed; the tests on the tool are limited to a single case study; and more tests are needed to verify its effectiveness. Originality/value - This research provides a 4D-BIM-based approach and a prototype tool for installation workspace analysis. It can be used to provide support for design optimization of prefabricated building assemblies.
机译:目的-建筑工业正在建筑业中兴起,因此,带有预制组件的建筑物越来越占优势。在大多数情况下,预制建筑组件是由工作人员手动安装的。如果某些组件设计不当,则会在工作人员的工作空间之间发生冲突,并且它们之间会发生冲突,这将对工人的生产率产生不良影响,甚至带来危险。本文的目的是提供一种基于4D建筑信息模型(BIM)的方法,以在详细设计过程中发现预制建筑组件的安装过程中潜在的工作空间冲突,从而提前消除它们。设计/方法/方法-首先,提供了工作空间建模方法;其次,分析了三种工作空间冲突。第三,建立了一种基于4D-BIM的方法;第四,开发了基于该方法的原型工具。最后,进行案例研究以测试该工具。结果-结果表明,所建议的工具可以检测或预防工作空间冲突,并通过一系列视图将其可视化;通过这样做,可以获得有价值的信息,以提高预制组件的设计质量。研究局限性/含义-所提出的方法和工具仅涉及设计不当的预制组件所造成的拥堵;需要进一步优化工具的速度;该工具的测试仅限于单个案例研究;并且需要更多测试以验证其有效性。原创性/价值-这项研究提供了一种基于4D-BIM的方法和用于安装工作区分析的原型工具。它可用于为预制建筑组件的设计优化提供支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号