Research findings are "sufficiently robust" for the wind industry to begin repowering with larger turbines in safer locations, or implementing measures to avoid or reduce bird deaths at Altamont Pass, according to a consultant's report for the California Energy Commission. The 520-page report, "Developing Methods to Reduce Bird Mortality in the Altamont Pass Wind Resource Area," is available on the Energy Commission's Website at: www.energy.ca.gov/pier/ reports/500-04-052 .html The report was released in early August by the Energy Commission and documents the results of a four-year study to address causal relationships between wind turbines and bird mortality in the Altamont Pass Wind Resource Area and to determine measures that could be implemented to reduce the incidence of bird collisions. Funded by the Commission's Public Interest Energy Research (PIER) program, the study was conducted by BioResource Consultants from Ojai, California. There's heightened urgency to resolve the environmental concerns, says the report, since it can be a hindrance to California's goal of producing 20 percent of its electricity from renewable sources, including wind, by 2010. That's because Alameda County will not allow permits to increase electrical production at Altamont beyond the existing 584-megawatt capacity "until there is demonstrated progress toward" reducing bird kills. Overall wind turbines in California have an installed generating capacity of 2,000 megawatts, including 800 megawatts at the Altamont Pass.
机译:根据加州能源委员会的一份顾问报告,研究结果对于风能行业来说“足够强大”,可以在更安全的地方开始使用更大的涡轮机进行供电,或者在Altamont Pass实施避免或减少鸟类死亡的措施。 520页的报告“开发降低阿尔塔蒙特山口风资源区鸟类死亡率的方法”可在能源委员会的网站上找到:www.energy.ca.gov/pier/reports/500-04-052 .html该报告由能源委员会于8月初发布,并记录了一项为期四年的研究结果,以研究阿尔塔蒙特山口风资源区风力涡轮机与鸟类死亡率之间的因果关系,并确定可以采取的措施来减少事故发生鸟的碰撞。由委员会公共利益能源研究(PIER)计划资助的这项研究由来自加利福尼亚州Ojai的BioResource顾问进行。报告说,解决环境问题的紧迫性越来越高,因为这可能会阻碍加利福尼亚州到2010年从可再生能源(包括风能)生产20%的电力的目标。这是因为阿拉米达县将不允许增加电力的许可直到现有的584兆瓦装机容量之外,阿尔塔蒙特(Altamont)的产量都“减少”为止,直到显示出“减少禽鸟死亡的进展”为止。加利福尼亚州的整个风力涡轮机的装机容量为2,000兆瓦,其中Altamont Pass的装机容量为800兆瓦。

著录项

  • 来源
    《Energy》 |2004年第3期|p.41|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 能源与动力工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号