机译:抽水蓄能的最佳投资时机和容量选择
Engineering Systems Division, Massachusetts Institute of Technology, 77 Massachusetts Avenue,Cambridge, MA 02139, USA;
Department of Industrial Economics and Technology Management, Norwegian University of Science and Technology, 7491 Trondheim, Norway;
Department of Electric Power Engineering, Norwegian University of Science and Technology,7491 Trondheim, Norway;
Department of Engineering and Public Policy and Tepper School of Business, Carnegie Mellon University, 5000 Forbes Avenue, Pittsburgh, PA 15213, USA;
Pumped hydropower storage; Real options; Wind power integration; European Energy Exchange; Mutually exclusive options;
机译:小型水电项目的投资时机和最佳容量选择
机译:考虑大热发电量的电力系统中最佳热储备容量的抽水蓄能电站最佳每周运行调度
机译:通过存储升级水电厂:时间和容量选择
机译:是时候建立影响电力行业的投资时间和能力选择吗?
机译:抽水蓄能水电的经济可行性。
机译:在回报率可再生能源支持下的最佳时机和容量选择
机译:抽水蓄能电站的最佳投资时机和容量选择