In the future, the foreseen increase of residential electricity consumption will force the Distribution System Operators to reinforce their networks at great expense. Through the emergence of ICT solutions and the increase of electric consumption flexibility at residential level, peak shaving has become an interesting alternative for reducing the investment costs in a distribution grid facing a load increase. This can be achieved with energy management systems (EMS) installed at residential level. Specifically, this work aims at considering peak shaving as an alternative to network reinforcement in a 20-year distribution planning study. For this purpose, the present work incorporates an optimal peak shaving approach to an accurate Convex DistFlow-based planning approach. Based on this, it quantifies how peak shaving can economically compete with network reinforcements for 12 real UK distribution networks under various flexibility scenarios. The results highlight that peak shaving is a competitive alternative to line reinforcement if the maximum initial line loading at the initial year of the planning study is under 80% of its nominal thermal rating value. It is also shown that EMS devices with a cost between 10 and 250 £/unit are economically competitive with network reinforcements depending on the considered network. Finally, this work proposes a planning decision metric, the initial line loading (ILL), measured at the beginning of the planning study, on the basis of which reinforcement decisions can be made.
机译:将来,预计住宅用电量的增加将迫使配电系统运营商以巨额费用加强其网络。通过ICT解决方案的出现和居民用电灵活性的提高,调峰已成为降低面对负荷增加的配电网投资成本的有趣选择。这可以通过在住宅级别安装能源管理系统(EMS)来实现。具体来说,这项工作的目的是在长达20年的配电规划研究中考虑将调峰作为网络强化的替代方法。为此,本工作将最佳的调峰方法与基于Convex DistFlow的准确计划方法结合在一起。基于此,它可以量化削峰如何在各种灵活性情景下经济地与12个英国实际分销网络的网络增强竞争。结果表明,如果在计划研究的第一年最大初始线路负荷低于其额定热额定值的80%,则削峰可替代线路加固。还表明,根据所考虑的网络,成本在10到250英镑/每单位之间的EMS设备在经济上与网络增强竞争。最后,这项工作提出了一个规划决策指标,即在规划研究开始时测量的初始线路荷载(ILL),并以此为基础做出加固决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号