首页> 外文期刊>Energy sources. Part B, Economics,planning,and policy >The Case of Baku-Tbilisi-Ceyhan Oil Pipeline System: A Review
【24h】

The Case of Baku-Tbilisi-Ceyhan Oil Pipeline System: A Review

机译:巴库-第比利斯-杰伊汉输油管道系统案例:回顾

获取原文
获取原文并翻译 | 示例
           

摘要

Baku-Tbilisi-Ceyhan (BTC) Main Export Oil Pipeline Project (MEP) is one of the very good demonstrations of how governments could come together for the same purpose and could promote the realization of the specific project. The BTC project, being the first leg of the East-West Energy Corridor and once treated as a "dream project" by some group of experts, has now almost turned in to a physical entity. Until now, detailed project studies confirmed the project is well within its previously estimated budget of 1.427 billion USD for the Turkish section of the pipeline. The next phase will be the Land Acquisition and Construction Phase, which will take 32 months onwards. BTC-MEP has a maximum capacity of 50 million tons/year (1 million barrels/year) and a total length of 1,743 km.
机译:巴库-第比利斯-杰伊汗(BTC)的主要出口石油管道项目(MEP)是政府如何为同一目的而团结起来并促进具体项目的实现的很好的示范之一。 BTC项目是东西方能源走廊的第一站,曾经被某些专家小组视为“梦想项目”,现在几乎变成了实体。到目前为止,详细的项目研究已确认该项目完全在先前估计的管道土耳其段14.27亿美元的预算之内。下一阶段将是土地征用和建设阶段,此过程将持续32个月。 BTC-MEP的最大容量为5000万吨/年(100万桶/年),总长度为1,743公里。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号