...
首页> 外文期刊>Energy sources >On the effectiveness of residential involuntary load curtailment programs
【24h】

On the effectiveness of residential involuntary load curtailment programs

机译:论住宅非自愿负荷缩减计划的有效性

获取原文
获取原文并翻译 | 示例
           

摘要

The critical peak hour problem is a fundamental issue for utility managers and policymakers. We address this issue by analyzing unique data from an involuntary load curtailment program, in which a group of households agreed to reduce the peak power consumption below the agreed load shedding limit. There are two types of results presented in the paper. Firstly, we show that residential customers reacted by lowering usage in critical peak hours by 6.30%, on average, and that 93.69% of the total consumption reduction is transferred to off-peak (earlier and later) hours on the same day. This decrease in usage is comparable with the effects of time of use (TOU) programs. Secondly, we identify that customers whose electricity usage was regularly below the load shedding limit also reduced their usage. We discuss such reactions to this non-binding restriction using a microeconomic approach and in the context of findings from behavioral science.
机译:关键高峰时段问题是公用事业管理人员和政策制定者的基本问题。 我们通过分析来自非自愿负载缩减计划的独特数据来解决这个问题,其中一组家庭同意降低商定的载荷缩小限额以下的峰值功耗。 本文中有两种类型的结果。 首先,我们展示了住宅客户通过平均降低了危急高峰时期的使用率降低了6.30%,并且总消耗减少的93.69%在同一天转移到off-Peak(早期和后期)小时。 这种使用减少与使用时间(TOU)程序的效果相媲美。 其次,我们确定电力使用量定期低于负载缩小限额的客户也降低了他们的使用情况。 我们使用微观经济方法和行为科学的调查结果讨论对这种非结合限制的这种反应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号