首页> 外文期刊>Energy Policy >An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system
【24h】

An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

机译:以约旦电力系统为例,研究计划标准变更对电力系统扩展计划的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems.
机译:许多因素有助于电力系统的规划过程。在扩展计划的背景下,重点放在选择标准上,这些选择标准可以优化相关因素,从而实现最佳性能。这被描述为在满足需求的同时降低成本并保持最小的运行风险。在本文中,研究了用于电力系统扩展研究计划的不同标准,目的是确定它们对扩展计划的影响。介绍了这些标准对约旦电力系统扩展研究的结果。结果显示出与实际采用的解决方案的良好对应性。旋转储备是对整个系统扩展成本最具影响力的计划标准。其次是峰值负载变化,以及用于增加容量以满足未来预期需求的候选单元的强制中断率。最后,预期的负载损失和未提供的能源成本对整体系统扩展成本的影响最小。这些结果突显了进行敏感性分析以确定最经济,最可接受的电力系统扩展计划的重要性。有必要不断更新规划标准,以适应电力系统和经济形势的变化和发展。最后,本研究的方法可以推广到其他电力系统。

著录项

  • 来源
    《Energy Policy》 |2010年第10期|p.6320-6329|共10页
  • 作者单位

    Al-Ahliyya Amman University, College of Engineering, AA University Post Office, Zip code 19328, Jordan;

    rnAl-Ahliyya Amman University, College of Engineering, AA University Post Office, Zip code 19328, Jordan;

    NEPC0, Department of Generation Planning, P.O. Box 2310, Amman 11194, Jordan;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    power system expansion studies; planning criteria; reliability;

    机译:电力系统扩展研究;规划标准;可靠性;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号