...
首页> 外文期刊>Energy Policy >Dynamic analysis of various investment incentives and regional capacity assignment in Iranian electricity market
【24h】

Dynamic analysis of various investment incentives and regional capacity assignment in Iranian electricity market

机译:伊朗电力市场中各种投资激励措施和区域容量分配的动态分析

获取原文
获取原文并翻译 | 示例
           

摘要

This paper develops a system dynamics model to analyze the impacts of different kinds of capacity payment as investment incentive mechanisms in Iranian electricity market. Since it is aimed that the incurred capital and operating costs of generation technologies be recovered in Iranian electricity pool, the noncompetitive capacity payment mechanism has been introduced for this purpose in order to encourage new investments in electric power generation system. In the current mechanism, the capacity payments are designated to the generating units in the whole country electricity market. An annual base value of capacity payment is proposed based on recovering the capital cost of a benchmark generation technology. This value is altered according to the operational reserve in the day-ahead electricity market. This supporting policy is simulated and analyzed in the proposed dynamic framework in order to track the trend of new investments in the Iranian electricity market. The feasibility study of implementing the regional capacity assignment is the main focus of this paper. Different possible regulating policies such as floating rates for capacity payment and electricity price cap, the multiple capacity payments to various technologies, and the regional electricity market with territorial capacity allocation are examined in order to investigate the consequences and performances of different decisions and policies in the capacity investment of Iranian electricity market.
机译:本文建立了系统动力学模型,以分析各种容量支付作为投资激励机制对伊朗电力市场的影响。由于旨在回收伊朗发电池中发电技术的资本和运营成本,为此目的引入了非竞争性容量支付机制,以鼓励对发电系统的新投资。在当前的机制中,将容量付款指定给全国电力市场中的发电机组。基于收回基准发电技术的资本成本,提出了容量支付的年度基本价值。该值根据日前电力市场中的运营储备而更改。在拟议的动态框架中对该支持政策进行了仿真和分析,以便跟踪伊朗电力市场上新投资的趋势。实施区域能力分配的可行性研究是本文的重点。研究了各种可能的监管政策,例如容量支付和电价上限的浮动费率,对各种技术的多重容量支付以及具有地域容量分配的区域电力市场,以调查不同决策和政策的后果和表现。伊朗电力市场的产能投资。

著录项

  • 来源
    《Energy Policy》 |2013年第5期|271-284|共14页
  • 作者单位

    Electricity Economics and Management Croup, Niroo Research Institute (NRI), Tehran, Iran;

    Center of Excellence in Power System Management and Control, Department of Electrical Engineering, Sharif University of Technology, Tehran, P. 0. Box: 11155-9363. Iran;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    system dynamics; investment incentives; capacity payment;

    机译:系统动力学;投资激励;能力支付;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号