Do Combined Heat and Power plants perform? Case study of publicly funded projects in New York

机译:热电联产厂表现如何?纽约公共资助项目的案例研究

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

We investigate lower than expected capacity factors of Combined Heat and Power plants using a publicly available dataset of hourly performance for plants in the state of New York. Low utilization of a CHP indicates underperformance. We examine possible causes of this underperformance including economic arbitrage, poor maintenance and operational practices, oversizing of plants, and reliability and resiliency needs. Based on seasonal and weekday/weekend capacity factor averages, we find that there is not enough evidence to support the economic arbitrage cause. Out of 99 plants in the dataset, 64 plants have average capacity factor below 60%, indicating they are either oversized and/or poorly maintained. This suggests that the current practice of one-time fixed incentive ($/kW) favors investment in capacity with no incentive for utilization (unlike a production credit which incentivizes generation $/kW h). From a policy perspective, this paper recommends better pre-engineering assessment for correct sizing, as well as revision of incentives based on performance. Additional information should be collected so that a more accurate ongoing analysis of the societal benefits of CHP projects can be made. Lastly, the energy efficiency gap, may be smaller than is commonly assumed and other options should be explored to meet energy efficiency goals. (C) 2016 Elsevier Ltd. All rights reserved.
机译:我们使用可公开获得的纽约州每小时性能数据集来调查热电联产电厂的低于预期容量的因素。 CHP利用率低表明性能不佳。我们研究了这种性能不佳的可能原因,包括经济套利,不良的维护和运营惯例,工厂规模过大以及可靠性和弹性需求。根据季节性和工作日/周末容量因子平均值,我们发现没有足够的证据支持经济套利原因。在数据集中的99株植物中,有64株的平均产能因子低于60%,表明它们过大和/或维护不善。这表明,目前的一次性固定激励($ / kW)做法倾向于在不鼓励利用的情况下进行容量投资(与生产信用激励的发电/ $ kW·h不同)。从政策的角度来看,本文建议进行更好的工程前评估,以正确确定规模,并根据绩效对激励措施进行修订。应该收集更多信息,以便对CHP项目的社会效益进行更准确的持续分析。最后,能效差距可能小于通常的假设,应探索其他选择方案以实现能效目标。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

  • 来源
    《Energy Policy》 |2016年第10期|618-627|共10页
  • 作者单位

    Rutgers State Univ, Edward J Bloustein Sch Planning & Publ Policy, Ctr Energy Econ & Environm Policy, 33 Livingston Ave, New Brunswick, NJ 08901 USA;

    Rutgers State Univ, Edward J Bloustein Sch Planning & Publ Policy, Ctr Energy Econ & Environm Policy, 33 Livingston Ave, New Brunswick, NJ 08901 USA;

    Rutgers State Univ, Edward J Bloustein Sch Planning & Publ Policy, Ctr Energy Econ & Environm Policy, 33 Livingston Ave, New Brunswick, NJ 08901 USA;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Combined Heat and Power; Energy efficiency gap; Capacity factor;

    机译:热电联产;能效差距;容量系数;