首页> 外文期刊>Energy & Environment >Renewable energy auctions - When are they (cost-)effective?
【24h】

Renewable energy auctions - When are they (cost-)effective?

机译:可再生能源拍卖-什么时候(具有成本效益)?

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

European Member States increasingly use tenders combined with competitive bidding to allocate renewable electricity support payments to renewable electricity market actors. This article contributes to the European policy debate by exploring which principal design features and context factors increase or reduce the effectiveness and cost-effectiveness of renewable electricity auctions. Volume control is among the key aims of implementing an auction, but potentially low project realisation can harm reaching the targeted volume. Qualification requirements and/or penalties are useful auction design elements to increase the implementation rates of selected projects. However, there are risks associated with these measures, which in turn increase prices. Auctions also aim at increasing (static) cost-effectiveness of renewable electricity support, which may be influenced by three main factors: first, the level of competition in the auction; second, the mitigation of speculative over- or under-bidding; and third, the level of allocation and delivery risks borne by the bidders. The article explores the fundamental trade-off in auctions between encouraging high project implementation rates (to ensure volume control) and minimising the bidder's risk (that may result in higher bidding prices). Based on theoretical insights and supported by empirical renewable electricity auction examples, it identifies factors that can influence the success of an auction but also shows there is no exact blueprint for a good auction design.
机译:欧洲成员国越来越多地使用招标与竞争性招标相结合的方式,将可再生能源支持费用分配给可再生能源市场参与者。本文通过探讨哪些主要设计特征和背景因素增加或降低了可再生电力拍卖的有效性和成本效益,为欧洲政策辩论做出了贡献。音量控制是实施拍卖的主要目标之一,但是潜在的项目实现量较低可能会损害达到目标音量。资格要求和/或罚款是有用的拍卖设计元素,可提高所选项目的执行率。但是,与这些措施相关的风险又反过来会提高价格。拍卖还旨在提高(可再生)电力支持的(静态)成本效益,这可能受到三个主要因素的影响:第一,拍卖的竞争水平;第二,拍卖的竞争水平。第二,缓解投机性的竞价或竞价不足;第三,投标人承担的分配和交付风险水平。本文探讨了在鼓励较高的项目执行率(以确保数量控制)与最小化投标人的风险(可能导致较高的投标价格)之间进行拍卖的基本权衡。基于理论洞察力,并以经验可再生电力拍卖示例为依据,它确定了可以影响拍卖成功的因素,但也表明没有好的拍卖设计蓝图。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号