Application of Innovative Technologies for a Continuous Commissioning Case Study

机译:创新技术在连续调试案例研究中的应用

获取原文
获取原文并翻译 | 示例
       

摘要

This article demonstrates the implementation of innovative technologies during continuous commissioning~® (CC) practices to improve building operations and reduce energy costs. A 46-year-old typical commercial building with a floor area of about 216,000 square feet was used as a case study building. The HVAC systems were upgraded and retrofitted in 2000. Variable frequency drives (VFDs) were installed for most of the fans and pumps. This CC project involved very minor HVAC retrofits and control upgrades. The new technologies include the fan airflow station (FAS) technology for building pressure control and supply fan control, and a recently developed pump water flow station for secondary pump control. The results show that these technologies improve building operation/maintenance and significantly reduce energy costs. The monthly average electricity savings for HVAC systems is 64 percent, and the average gas savings is 49 percent.
机译:本文演示了在持续调试(CC)的实践中创新技术的实施,以改善建筑物的运行并降低能源成本。案例研究大楼使用了46年历史的典型商业建筑,建筑面积约为216,000平方英尺。 HVAC系统在2000年进行了升级和改造。大多数风扇和泵都安装了变频驱动器(VFD)。此CC项目涉及极少量的HVAC改造和控制升级。新技术包括用于建筑物压力控制和送风机控制的风扇气流站(FAS)技术,以及最近用于二次泵控制的泵水流站。结果表明,这些技术改善了建筑物的运营/维护并显着降低了能源成本。 HVAC系统的每月平均节电为64%,平均节气为49%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号