...
首页> 外文期刊>Energy education science and technology >Risk element transfer: A new method to measure the risk of energy-saving type construction company
【24h】

Risk element transfer: A new method to measure the risk of energy-saving type construction company

机译:风险要素转移:衡量节能型建筑公司风险的新方法

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Energy-saving type construction company faces increasingly arising serious risks because of the construction system reforms, the diversification of contract format and the complications of large modern project items. How to deal with these risks becomes an important problem which needs to be considered seriously by a energy-saving type construction company. However, risk management in energy-saving type construction project in China is just on the horizon. The weakness of consciousness and the lack of ability in risk management exits in most of the construction companies, so it is imperative to carry out research on risk management in energy-saving type construction companies. Based on the rigorous reality, the paper puts forward a new theory to measure the risk of energy-saving type construction company: the theory of risk element transfer. In detail, the process of risk transfer is decomposed into two sub procedures: risk element reduction recursive procedure and risk element elastic process. The two processes are related to how the risk will be changed under enterprise external condition and internal condition respectively. To measure risk properly, four new variables are presented. Focus on them, we are able to measure risk on single project and multiple project in order to minimum the risk and maximize the profit of construction company.
机译:节能型建筑公司由于建筑体制改革,合同形式的多样化以及大型现代工程项目的复杂化而面临越来越严重的风险。如何应对这些风险成为节能型建筑公司必须认真考虑的重要问题。但是,中国节能型建设项目的风险管理才刚刚开始。大多数建筑公司都存在意识薄弱和风险管理能力不足的问题,因此有必要开展节能型建筑公司的风险管理研究。在严谨的现实基础上,提出了衡量节能型建筑公司风险的新理论:风险要素转移理论。详细地,风险转移过程被分解为两个子过程:风险元素减少递归过程和风险元素弹性过程。这两个过程分别与企业在外部条件和内部条件下如何改变风险有关。为了正确地衡量风险,提出了四个新变量。专注于它们,我们能够测量单个项目和多个项目的风险,以最小化风险并最大化建筑公司的利润。

著录项

  • 来源
    《Energy education science and technology》 |2013年第1期|367-372|共6页
  • 作者单位

    North China Electric Power University, Department of Management Science and Engineering, Beijing, China;

    North China Electric Power University, Department of Management Science and Engineering, Beijing, China;

    North China Electric Power University, Department of Management Science and Engineering, Beijing, China;

    North China Electric Power University, Department of Management Science and Engineering, Beijing, China;

    North China Electric Power University, Department of Management Science and Engineering, Beijing, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Risk reduction; Recursive procedure; Elastic process; Energy-saving type construction company;

    机译:降低风险;递归程序;弹性过程;节能型建筑公司;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号