Experimental analysis on the air distribution of powerhouse of Hohhot hydropower station with 2D-PIV

机译:呼和浩特水电站厂房2D-PIV空气分布的实验分析

获取原文
获取原文并翻译 | 示例
           

摘要

Hohhot hydropower station is being built from the year of 2007. There are many complicated heating facilities and equipment in the powerhouse, such as electricity generators and transformer. The air distribution of the powerhouse is affected by the complex heat sources. In this paper the model size is 1/50 of the real scale and 2D-P1V is used to study the air distribution in the model of large underground space. The supply outlet is located on the roof and the heat source is located on the floor. The different supply air conditions and heat release rate are discussed. Three air supply are discussed: v/v_0 = 0.75, v/v_0 = 1, v/v_0 = 1.25 (v_0 is designed air supply speed, v_0 = 0.94 m/s). And we also carry out three heat release rates: Q/Q_0 = 0.75, Q/Q_0 = 1, Q/Q_0 = 1.25 (Q_0 is designed heat release rate, Q_0 = 7.12 W). The results show that the supply air velocity has a remarkable effect on air distribution characteristics of the large space and occupant zone velocity. However, it is also observed that the heat release rate has little effect on air distribution of large space and occupant zone velocity. The air supply velocity and the air inlet location should be paid more attention in designing air distribution. The experimental findings are useful for optimizing the design of air distribution in a large space with complex heat sources.
机译:呼和浩特水电站从2007年开始建设。电站中有许多复杂的供暖设施和设备,例如发电机和变压器。动力室的空气分布受复杂热源的影响。本文的模型尺寸为实际比例的1/50,并使用2D-P1V来研究大型地下空间模型中的空气分布。供应出口位于屋顶上,热源位于地板上。讨论了不同的送风条件和放热率。讨论了三种气源:v / v_0 = 0.75,v / v_0 = 1,v / v_0 = 1.25(v_0是设计的气源速度,v_0 = 0.94 m / s)。而且我们还执行三种放热速率:Q / Q_0 = 0.75,Q / Q_0 = 1,Q / Q_0 = 1.25(Q_0是设计的放热速率,Q_0 = 7.12 W)。结果表明,送风速度对大空间的空气分布特性和乘员区速度有显着影响。然而,还观察到,放热率对大空间的空气分布和乘员区域速度几乎没有影响。在设计空气分配时,应更加注意送风速度和进气口位置。实验结果对于优化具有复杂热源的大空间中的空气分配设计很有用。

著录项

  • 来源
    《Energy Conversion & Management》 |2010年第1期|33-41|共9页
  • 作者单位

    School of Environmental and Municipal Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China;

    School of Environmental and Municipal Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China China National Light Industry, Wuhan Design Engineering Co., Ltd., Wuhan 430060, China;

    School of Environmental and Municipal Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China;

    School of Environmental and Municipal Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China;

    China Hydropower Survey and Design Institute, Beijing 100024, China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    2D-PIV; air distribution; ventilation;

    机译:2D-PIV;空气分配通风;