首页> 外文期刊>Energy Conversion & Management >Total output operation chart optimization of cascade reservoirs and its application
【24h】

Total output operation chart optimization of cascade reservoirs and its application

机译:梯级水库总输水作业图优化及其应用

获取原文
获取原文并翻译 | 示例
           

摘要

With the rapid development of cascade hydropower stations in recent decades, the cascade system composed of multiple reservoirs needs unified operation and management. However, the output distribution problem has not yet been solved reasonably when the total output of cascade system obtained, which makes the full utilization of hydropower resources in cascade reservoirs very difficult. Discriminant criterion method is a traditional and common method to solve the output distribution problem at present, but some shortcomings cannot be ignored in the practical application. In response to the above concern, this paper proposes a new total output operation chart optimization model and a new optimal output distribution model, the two models constitute to a double nested model with the goal of maximizing power generation. This paper takes the cascade reservoirs of Li Xianjiang River in China as an instance to obtain the optimal total output operation chart by the proposed double nested model and the 43 years historical runoff data, progressive searching method and progressive optimality algorithm are used in solving the model. In order to take the obtained total output operation chart into practical operation, mean value method and stepwise regression method are adopted to extract the output distribution ratios on the basis of the optimal simulation intermediate data. By comparing with discriminant criterion method and conventional method, the combined utilization of total output operation chart and output distribution ratios presents better performance in terms of power generation and assurance rate, which proves it is an effective alternative method to deal with the cascade reservoirs joint operation problem.
机译:近几十年来,随着梯级水电站的快速发展,由多个水库组成的梯级系统需要统一的运行管理。但是,当获得梯级系统的总产量时,产量分配问题尚未得到合理解决,这使得梯级水库中水力资源的充分利用非常困难。判别判据法是目前解决输出分配问题的传统方法,但在实际应用中存在一些不足。针对上述问题,本文提出了一种新的总输出运行图优化模型和一种新的最优输出分配模型,这两个模型构成了以最大发电量为目标的双嵌套模型。本文以李仙江梯级水库为例,通过提出的双嵌套模型获得最优总产量运行图,并利用43年历史径流数据,采用渐进搜索法和渐进最优算法求解模型。 。为了使获得的总输出运行图投入实际运行,在优化模拟中间数据的基础上,采用均值法和逐步回归法提取输出分配比。通过与判别判据法和常规方法的比较,总输出运行图和输出分配比的综合利用在发电量和保证率方面表现出较好的性能,证明了它是处理梯级水库联合运行的有效替代方法。问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号