首页> 外文期刊>Energy Conversion & Management >Equipment sizing in a coal-fired municipal heating plant modernisation project with support for renewable energy and cogeneration technologies
【24h】

Equipment sizing in a coal-fired municipal heating plant modernisation project with support for renewable energy and cogeneration technologies

机译:支持可再生能源和热电联产技术的燃煤市政供热厂现代化项目中的设备选型

获取原文
获取原文并翻译 | 示例
           

摘要

The paper presents results of design parameters optimisation of a wood chips fired steam boiler based heat and power block in a sample project of coal fired municipal heating plant modernisation. The project assumes the conversion of the heating plant into a dual fuel heat and power plant. The problem that is presented is selection of cogeneration block structure and thermodynamic parameters taking into account financial support mechanisms for cogeneration and renewable energy technologies. There are examined energy conversion and financial performances of the project. The results show that without the financial support the project is not profitable although it generates savings of primary energy of fossil fuels. If an administrative incentives are applied the optimal technical solution is different than suggested by energy conversion efficiency or fossil fuel savings. Financial calculations were performed for Polish marked conditions in the years 2011 and 2014 showing the impact of relatively short term variations of prices and support intensity on optimal plant design parameters.
机译:本文介绍了一个燃煤市政供热厂现代化样本项目中基于木屑的蒸汽锅炉基于热电模块的设计参数优化的结果。该项目假设将供热厂转换为双燃料热电厂。提出的问题是在考虑热电联产和可再生能源技术的财政支持机制的情况下,选择热电联产的结构和热力学参数。检查了项目的能源转换和财务绩效。结果表明,尽管没有资金支持,该项目却无法盈利,尽管它可以节省化石燃料的一次能源。如果采用行政激励措施,则最佳技术解决方案将不同于能源转换效率或节省化石燃料所建议的解决方案。对波兰在2011年和2014年标记的条件进行了财务计算,显示价格和支撑强度的相对短期变化对最佳工厂设计参数的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号