首页> 外文期刊>Energy Conversion & Management >Comment on 'Short-term combined economic emission scheduling of hydrothermal power systems with cascaded reservoirs using differential evolution' by K.K. Mandal and N. Chakaborty [Energy Convers. Manage. 50 (2009) 97-104]
【24h】

Comment on 'Short-term combined economic emission scheduling of hydrothermal power systems with cascaded reservoirs using differential evolution' by K.K. Mandal and N. Chakaborty [Energy Convers. Manage. 50 (2009) 97-104]

机译:K.K.评论“具有级联水库的水火发电系统的短期综合经济排放调度”。 Mandal和N. Chakaborty [能量转换。管理。 50(2009)97-104]

获取原文
获取原文并翻译 | 示例
           

摘要

This paper discusses the short-term combined economic emission scheduling of hydrothermal power systems with cascaded reservoirs [Energy Conyers Manage. 50 (2009) 97-104], while differential evolution algorithm has been employed to solve the optimization problem. However, this problem is subjected to several constraints like the generation limitations of generating units. The solutions reported in the original paper do not satisfy the constraint on the initial and final reservoir storage volumes of hydro units as well as the constraint on the generated power by such units, which should be Positive at any time of the scheduling period. Thus, this paper intends to prove this issue and solve the problem using Normal Boundary Intersection (NBI) method, in order to propose the correct solutions satisfying all the constraints of the short-term hydrothermal scheduling problem. (C) 2015 Elsevier Ltd. All rights reserved.
机译:本文讨论了具有级联水库的水热发电系统的短期组合经济排放调度[Energy Conyers Manage。 50(2009)97-104],而差分进化算法已用于解决优化问题。然而,该问题受到诸如发电单元的发电限制之类的若干约束。原始论文中报告的解决方案不满足对水力单元的初始和最终水库存储量的约束,也不满足对此类单元的发电量的约束,在调度周期的任何时间,该约束都应为正。因此,本文旨在证明这一问题并使用法向边界相交(NBI)方法解决该问题,从而提出能够满足短期热液调度问题所有约束条件的正确解决方案。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号