首页> 外文期刊>IEEE Transactions on Energy Conversion >Parameters required to maximize a thermoset hydro-generator stator winding life. Part I-design, manufacture, installation
【24h】

Parameters required to maximize a thermoset hydro-generator stator winding life. Part I-design, manufacture, installation

机译:最大化热固性水轮发电机定子绕组寿命所需的参数。第一部分设计,制造,安装

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes the parameters required for a thermoset hydro-generator stator winding to achieve a service life of 50 years. Such parameters covering design, manufacture, installation, online monitoring and maintenance functions have been found to be relevant based on 36 years of design and operation experience. The database includes North American, European and Far Eastern hydro generators up to 20.5 kV-500 MVA. Parameters covered can be simply stated as design, installation and manufacture: the DIM rule.
机译:本文介绍了热固性水轮发电机定子绕组达到50年使用寿命所需的参数。基于36年的设计和操作经验,已经发现涉及设计,制造,安装,在线监视和维护功能的此类参数具有相关性。该数据库包括20.5 kV-500 MVA以下的北美,欧洲和远东水力发电机。所涵盖的参数可以简单地表示为设计,安装和制造:DIM规则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号