首页> 外文期刊>Energy and Buildings >Analysis of an effective solution to excessive heat supply in a city primary heating network using gas-fired boilers for peak-load compensation
【24h】

Analysis of an effective solution to excessive heat supply in a city primary heating network using gas-fired boilers for peak-load compensation

机译:分析使用燃气锅炉补偿峰值负荷的城市一次供热网络中过量供热的有效解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

Through investigation of the Dengfeng heating network in the city of Daqing, China, for the 2007-2008 heating season, we found serious problems of excessive heat supply in the primary heating network. Therefore, we propose the application of gas-fired boilers in underperforming heating substations as peak-load heat sources to effectively adapt to the regulation demands of seasonal heat-load fluctuations and reduce the excessive heat supply. First, we calculated the excessive heat supply rates (EHSRs) of five substations using detailed investigative data. We then discussed the feasibility of the proposed scheme providing energy savings from both energetic and exergetic points of view. The results showed that the average EHSR of the five substations between January and March was 20.57% of the gross heat production but consequently reduced to 6.24% with the installation of the gas-fired boilers. Therefore, the combined heating scheme with coal as the basic heat-source and gas-fired boilers as peak-load heat sources is energy-efficient to some extent, although requires the use of natural gas. Meanwhile, the exergy decreased by 10.97%, which indicates that the combined heating scheme effectively reduces the primary energy consumption and pollutant emission of the heating systems.
机译:通过对中国大庆市登封市供热网络的调查,得出2007-2008年供热季节的主要供热网络存在严重供热问题。因此,我们建议在性能不佳的变电站中将燃气锅炉作为峰值负荷热源应用,以有效地适应季节性热负荷波动的调节要求并减少过多的供热。首先,我们使用详细的调查数据计算了五个变电站的过量供热率(EHSR)。然后,我们从精力充沛和精力充沛的角度讨论了提出的节能方案的可行性。结果表明,五个变电站在一月至三月之间的平均EHSR占总热量生产的20.57%,但由于安装了燃气锅炉而降低到6.24%。因此,尽管需要使用天然气,但以煤炭为基本热源和燃气锅炉为峰值负荷热源的联合供热方案在某种程度上是节能的。同时,火用减少了10.97%,这表明组合式供暖方案有效地减少了供暖系统的一次能源消耗和污染物排放。

著录项

  • 来源
    《Energy and Buildings》 |2010年第11期|P.2090-2097|共8页
  • 作者单位

    School of Municipal & Environmental Engineering, Harbin Institute of Technology, mail box 2645, 202 Haihe Road, Nangang District, Harbin 150090, PR China;

    rnSchool of Municipal & Environmental Engineering, Harbin Institute of Technology, mail box 2645, 202 Haihe Road, Nangang District, Harbin 150090, PR China;

    rnSchool of Municipal & Environmental Engineering, Harbin Institute of Technology, mail box 2645, 202 Haihe Road, Nangang District, Harbin 150090, PR China;

    rnSchool of Municipal & Environmental Engineering, Harbin Institute of Technology, mail box 2645, 202 Haihe Road, Nangang District, Harbin 150090, PR China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    heating system; primary heating network; excessive heat supply rate; exergy; gas-fired boiler;

    机译:加热系统;初级供热网络;供热率过高;火用燃气锅炉;