首页> 外文期刊>Energy analects >Consultation Underway For Maj Or Transmission Project
【24h】

Consultation Underway For Maj Or Transmission Project

机译:正在进行大型或输电项目的咨询

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Manitoba Hydro has started the first of four rounds of community and public consultation for the proposed Bipole III high-voltage, direct-current (HVDC) transmission project.rnTwo teams of Manitoba Hydro representatives are conducting the sessions, including meetings with elected officials and leaders of communities that could be affected by construction of the project as well as public open houses. The Crown-owned utility will meet with about 150 communities and organizations as part of this process.rnBipolelHis amajorHVDC transmission project required to improve the reliability of the existing transmission system. It will also provide additional transmission capacity to get new northern hydroelectric generation to southern markets.
机译:曼尼托巴水电已启动拟议的Bipole III高压直流输电项目的四轮社区和公众咨询中的第一轮。rn曼尼托巴水电的两支团队正在举行会议,包括与当选官员和领导人的会议受项目建设以及公共开放房屋影响的社区。作为此过程的一部分,这家由皇冠拥有的公用事业公司将与约150个社区和组织会面。rnBipolel的主要高压直流输电项目需要提高现有输电系统的可靠性。它还将提供更多的输电能力,以将新的北方水力发电带到南方市场。

著录项

  • 来源
    《Energy analects》 |2008年第12期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号