首页> 外文期刊>Energy analects >Oeb Considers Changes For Transmission Connections
【24h】

Oeb Considers Changes For Transmission Connections

机译:Oeb考虑更改传输连接

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Based upon comments received during its Transmission Connection Cost Responsibility Review (TCCRR) consultation, the Ontario Energy Board (OEB) believes its existing policies generally do not present an obstacle to connecting new renewable generation facilities to the provincial grid.rnAs noted in a discussion paper the OEB produced on the issue, "significant generator connection activity has occurred under the existing policy framework, including the connection of renewable generation facilities."rnThe OEB said its existing connections policies have been successful at connecting renewable generation even when located some distance from the grid.rnBut, the OEB pointed out these connection cases have involved single proponent projects in areas less remote than those proposed in the Integrated Power System Plan (IPSP) proposed by the Ontario Power Authority.
机译:根据在传输连接成本责任审查(TCCRR)磋商期间收到的评论,安大略省能源委员会(OEB)认为,其现有政策通常不会对将新的可再生能源发电设施连接到省级电网构成障碍。 OEB对此进行了调查,“在现有的政策框架下,发生了重大的发电机连接活动,包括可再生能源发电设施的连接。” OEB表示,即使与可再生能源的发电站相距遥远,其现有的连接政策也已成功地实现了可再生能源的连接。但是,OEB指出,这些连接案例所涉及的项目仅比安大略省电力局提出的综合电力系统计划(IPSP)所建议的项目偏远。

著录项

  • 来源
    《Energy analects》 |2009年第1期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号