Power supply discontinuity indicator (PSDI) is estimated in this paper under the fact that, the permanent growth of power demand of distribution system creates a convenient increasing of substations number and lines length, otherwise, the increasing of these variables changes the networks configuration. The problem is investigated here to determine the mathematical model which describe the relationship between the PSDI and the independent variables (lines and substations) or q= f(L,N ) in the (66) kV networks which play more important role in power distribution systems. The regression analysis is used for obtaining the (66) kV network mathematical model, taking into account that, this network is designed to be as a ring network at the end of the development plane similar to the southern region (66) kV network configuration in Syrian Arab Republic, where, the final configuration is achieved through a few stages of the interconnection development in two periods of time: (1985-1989) and (1990-1994), respectively. The method of estimating the reliability indices is developed on the basis of the minimal cutset and simulation techniques. The mathmatical model is done depending on the factorial experimental design after replicating the calculation of the following indices for every scheme of the network development: the expected failure rate, average interruption duration, average load disconnected, and average energy not supplied due to fault and maintenance interruptions. Confiding the goodness of fit of the mathematical model q=f(L,N) shows that: adjusting the Syrian (66) kV network configuration by increasing the lines length improves the reliability of supply (i.e. decreases the (PSDI)) more than the case of increasing the number of substations, until the moment that, the (66) kV network will be operated as a ring system. This fact ephasis the existed configuration, where, a few of substations is supplied yet radially.
机译:在本文中估计了电源不连续指示器(PSDI),在本文的情况下,分配系统的电力需求永久增长创造了方便的变电站数和线长度,否则,这些变量的增加会改变网络配置。这里研究了该问题以确定描述PSDI和独立变量(线条和变电站)或Q = F(L,N)之间的关系的数学模型,在功率分布中起更重要的作用系统。回归分析用于获取(66)kV网络数学模型,考虑到,该网络被设计为在类似于南部区域(66)kV网络配置的开发平面末端的环网阿拉伯叙利亚共和国,在哪里,最终配置是通过两次互连开发的几个阶段实现的:(1985-1989)和(1990-1994)。估计可靠性指数的方法是基于最小的防芯和仿真技术开发的。数学模型是根据因子实验设计完成的,在网络开发的每种方案的计算后计算以下指数:预期失败率,平均中断持续时间,平均负载断开,以及由于故障和维护而提供的平均能量中断。暗示数学模型的健康Q = F(L,N)表明:通过增加线长度来调整叙利亚(66)kV网络配置,提高了供应的可靠性(即减少(PSDI))比增加变电站数量的情况,直到瞬间,(66)kV网络将作为环系统操作。这一事实以EPHAS存在于存在的配置,其中一些变电站径向提供。

著录项

  • 来源
    《Elektrie》 |2020年第7837期|13-18|共6页
  • 作者

    Hassan Al-Haji; Safar Hilal;

  • 作者单位

    Faculty of Electrical & Electronical Engineering - University of Aleppo (Syria);

    Faculty of Electrical & Electronical Engineering - University of Aleppo (Syria);

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号