首页> 外文期刊>Electronic Journal of Geotechnical Engineering >Soil/Pile Set-up Effects on Driven Pile in Malaysian Soil
【24h】

Soil/Pile Set-up Effects on Driven Pile in Malaysian Soil

机译:土/桩设置对马来西亚土壤打桩的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Bearing capacity of a driven pile often increases with time after its installation. This phenomenon is well known as soil/pile set-up. Although the phenomenon is common and has been reported by many researchers, the increase capacity of pile with time is not always considered in pile design. This is mainly due to lack of understanding about the mechanism behind how principal factors such as soil type, pile material and its installation method affect soil/pile set-up. Pile testing such as maintained load test (mlt) or dynamic pile testing (dpt) is only conducted only after some time after installation. This raises some questions on the rate of pile capacity increase and the length of time after which soil/pile set-up effect becomes insignificant. Although in reality, the capacity increase of pile depends on various factors, the duration of full set-up is assumed to be dependent solely on soil type and rule-of-thumb judgment of the engineer at site is normally practiced. Consideration of the above factors has lead to this study, which has been carried out to investigate the soil/pile set-up as happened in Malaysian soil. Six case studies on soil/pile set-up in Malaysian soil conditions are presented. Pile capacities obtained from tests carried out at different elapsed time after installation are compared in order to further understand the effects of soil/pile set-up on driven pile capacities. Soil/pile set-up factor is back-calculated to understand its effects on Malaysian soil. Time effects on ratio of pile capacity at time, t over initial pile capacity (qt/q-initial) is also discussed at the end of this paper.
机译:安装后,随动桩的承载力通常会随时间增加。这种现象被称为土壤/桩结构。尽管这种现象很普遍,并且已被许多研究人员报道,但是在桩设计中并不总是考虑随时间增加桩的能力。这主要是由于缺乏对诸如土壤类型,桩材料及其安装方法等主要因素如何影响土壤/桩结构的背后机制的理解。仅在安装后一段时间后才进行桩测试,例如保持载荷测试(mlt)或动态桩测试(dpt)。这就引起了一些关于桩容量增加率和桩/土设置效果变得微不足道的时间长度的问题。尽管实际上,桩的容量增加取决于多种因素,但完整设置的持续时间被认为仅取决于土壤类型,并且通常采用现场工程师的经验法则判断。考虑到上述因素导致了这项研究,该研究旨在调查马来西亚土壤中发生的土壤/桩结构。提出了六个关于马来西亚土壤条件下土壤/桩结构的案例研究。比较了在安装后的不同经过时间进行的测试中获得的桩容量,以便进一步了解土/桩设置对打桩容量的影响。重新计算了土壤/桩的建立因子,以了解其对马来西亚土壤的影响。本文最后还讨论了时间对时间t桩容量之比t对初始桩容量(qt / q-initial)的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号