...
首页> 外文期刊>Electrical Technology Russia >PROBLEMS OF THE DEVELOPMENT OF CIRCUITS AND OERATING CONDITIONS FOR THE PARALLEL OPERATION OF THE TRANS-CAUCASUS POWER SYSTEMS IN THE POWER POOL OF THE COUNTRIES OF THE BLACK SEA BASIN
【24h】

PROBLEMS OF THE DEVELOPMENT OF CIRCUITS AND OERATING CONDITIONS FOR THE PARALLEL OPERATION OF THE TRANS-CAUCASUS POWER SYSTEMS IN THE POWER POOL OF THE COUNTRIES OF THE BLACK SEA BASIN

机译:黑海盆地国家的电力储库中跨输配电系统并联运行的电路开发和运行条件问题

获取原文
获取原文并翻译 | 示例
           

摘要

The technical and economic problems involved in setting up parallel operation of the Integrated Power System (IPS) of the Trans - Caucasus region with the power pool of Turkey are considered in a project to establish a power pool of the countries of the black and Caspian sea basins. Optimization of the circuits and operating conditions of the electrical networks of the Trans-Caucasus IPS are considered to provide scope for the export of electric power from the power pool to Turkey.
机译:在建立黑海和里海国家电力库的项目中,考虑了跨高加索地区的综合电力系统(IPS)与土耳其的电力库并联运行所涉及的技术和经济问题盆地。跨高加索IPS的电路和运行网络条件的优化被认为为从电力池向土耳其的电力输出提供了空间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号