首页> 外文期刊>IEEE Electrical Insulation Magazine >Partial discharge. XXV. Calibration of PD measurements for motor and generator windings-why it can't be done
【24h】

Partial discharge. XXV. Calibration of PD measurements for motor and generator windings-why it can't be done

机译:局部放电。二十五。电机和发电机绕组的局部放电测量的校准-为什么无法完成

获取原文
获取原文并翻译 | 示例
       

摘要

In most types of high voltage apparatus, a PD acceptance test is required. In contrast, the PD test is very rarely used as an acceptance test for new motor and generator windings. The closest that machine manufacturers come to a PD acceptance test is the power factor tip-up test (IEEE Standard 286), which is an indirect PD test. The tip-up test is sensitive to PD sources when testing individual coils/bars but is relatively insensitive when testing complete windings, due to the presence of stress relief coatings. The lack of a direct PD acceptance test fundamentally results from the inductive nature of a stator winding. This article discusses the reasons for the lack of an absolute PD measurement criteria for stator windings, after a discussion on measurement methods and the quantities used to measure PD activity.
机译:在大多数类型的高压设备中,需要进行PD验收测试。相比之下,PD测试很少用作新的电动机和发电机绕组的验收测试。机器制造商最接近PD接受测试的是功率因数提升测试(IEEE标准286),这是一种间接PD测试。当测试单个线圈/条时,自升式测试对PD源敏感,但由于存在应力消除涂层,因此在测试完整绕组时相对不敏感。缺乏直接的PD验收测试的根本原因是定子绕组的电感特性。在讨论了测量方法和用于测量PD活动的量之后,本文讨论了定子绕组缺乏绝对PD测量标准的原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号