When making decisions on infrastructure operation and replacement, utilities must take into account the risk of an asset failing and starting a fire or exploding. However, the challenge in determining the likelihood of such a failure is that since their rate is so low, there is often little statistical information available on which to analyze. A question posed by the Australian and New Zealand utilities is whether transformer fires and explosions become more likely with age. Since the power transformer fleets of these two countries are comparable, with a large number entering the later years of their useful lives, a relationship between nameplate age and fire and explosion likelihood will have implications on replacement policy.
机译:在决定基础架构的运行和更换时,公用事业公司必须考虑到资产发生故障并引发火灾或爆炸的风险。但是,确定此类故障可能性的挑战在于,由于其发生率如此之低,因此通常很少有可用于分析的统计信息。澳大利亚和新西兰公用事业公司提出的一个问题是,随着年龄的增长,变压器起火和爆炸的可能性是否更大。由于这两个国家的电力变压器车队具有可比性,并且大量进入其使用寿命的后期,因此铭牌使用年限与火灾和爆炸可能性之间的关系将对更换政策产生影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号