Methodical installation and commissioning of electrical switchboards are key to successful and trouble-free operation. Proper foundation, sturdy and error-free connections - electrical or mechanical, use of right tools and gauges and calibrated measuring equipments, testing to schedule and keeping detailed records thereof help the operating personnel at a later stage to run the switchboard and maintain the same with least difficulty. Safety is also of utmost importance, especially, while transporting the panels on to the foundation and during dielectric tests.
机译:电气配电盘的有条不紊的安装和调试是成功且无故障运行的关键。正确的基础,坚固且无差错的连接-电气或机械连接,使用正确的工具和量规以及已校准的测量设备,进行测试以安排时间表并保留其详细记录,有助于操作人员在以后的阶段操作配电盘并保持配电盘的状态。最小的困难。安全也至关重要,特别是在将面板运输到地基上以及进行介电测试时。

著录项

  • 来源
    《Electrical India》 |2011年第7期|p.36-384042|共5页
  • 作者

    Subir Majumdar;

  • 作者单位

    Electrical Engineering from Benares Hindu University and thereafter worked for Siemens Ltd;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号