首页> 外文期刊>Electrical India >Power Transmission lines and Power Projects in the Offing
【24h】

Power Transmission lines and Power Projects in the Offing

机译:输电线路和近期电力工程

获取原文
获取原文并翻译 | 示例
           

摘要

An adequate supply of electricity to provide power consistently for growth of every sector in the state and augmentation of inter-regional capacity is must for a country's economic prowess. Major steps being taken by the Government to boost power sector in country are - acceleration in generation capacity addition during 12th Plan with a target of 88,537 MW from conventional sources and 30,000 MW from renewable energy sources; bridging the gap of indigenous coal availability through coal imports for increased generation by thermal plants and promoting energy conservation, energy efficiency and demand side management measures.
机译:一个国家的经济实力必须有充足的电力供应,以持续为该州每个部门的发展提供电力,并提高区域间的能力。政府为促进该国的电力部门而采取的主要步骤是-在第十二个计划期间加快发电能力的增加,其目标是传统能源为88,537兆瓦,可再生能源为30,000兆瓦;通过进口煤炭弥合本国煤炭可利用量的缺口,以增加火电厂的发电量,并促进节能,能效和需求侧管理措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号