Avoiding Costly Surprises With A bid requires some precautionary diligence. A complete estimate and followup on the job after a successful bid are parts of the equation. Understanding and noting out-of-the-ordi-nary costs is the balance of the formula. Some of the estimators' duties that are required to get all pertinent project information will probably overlap those of other personnel. This can be a sensitive matter and must be handled by all involved in an intelligent manner, keeping in focus the success of the bid, project, and finally, the company. As part of the management team, estimators should assume responsibility for gathering and keeping track of all the facts considered in the process of estimating a project. Some information may be irrelevant. Be assured that any field problems can affect future bids; field personnel's feedback is one source of information.
机译:避免出价高昂的意外,需要谨慎行事。中标后,需要对工作进行完整的估算和跟进。理解并注意到普通费用是公式的平衡。获取所有相关项目信息所需的一些评估员职责可能与其他人员的职责重叠。这可能是一件敏感的事情,必须由所有相关人员以明智的方式进行处理,以确保投标,项目以及最终公司的成功。作为管理团队的一部分,估算人员应负责收集和跟踪估算项目过程中考虑的所有事实。某些信息可能无关紧要。请放心,任何现场问题都可能影响以后的出价;现场人员的反馈是信息来源之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号