...
首页> 外文期刊>Electric power systems research >Overload and overvoltage in low-voltage and medium-voltage networks due to renewable energy - some illustrative case studies
【24h】

Overload and overvoltage in low-voltage and medium-voltage networks due to renewable energy - some illustrative case studies

机译:低压和中压网络中由于可再生能源造成的过载和过电压-一些说明性案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents the use of curtailment to allow more wind or solar power to be connected to a distribution network when overcurrent or overvoltage set a limit. Four case studies, all based on measurements, are presented. In all cases the hosting capacity method is used to quantify the gain in produced energy for increased levels of distributed renewable energy resources. A distinction is made between "hard curtailment" where all production is disconnected when overcurrent and overvoltage limits are exceeded and "soft curtailment" where the amount of production to be disconnected is minimized. It is shown that the type of curtailment method used has a large impact on the amount of delivered energy to the grid. The paper further discusses details of the curtailment algorithm, alternatives to curtailment, the communication needs and risks associated with the use of curtailment.
机译:本文提出了在过电流或过电压设置限制时使用削减措施以允许更多的风能或太阳能连接到配电网络的方法。提出了全部基于测量的四个案例研究。在所有情况下,主机容量方法用于量化分布式可再生能源资源水平提高所产生的能源收益。在“硬限制”和“软限制”之间是有区别的,“硬限制”是在超过过电流和过电压限制时将所有生产都断开,而“软限制”是在要断开的生产量最小的情况下。结果表明,所使用的削减方法的类型对输送到电网的能量有很大的影响。本文进一步讨论了削减算法的细节,削减的替代方法,沟通需求以及与削减使用相关的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号