首页> 外文期刊>Electric power systems research >Maximizing hydro share in peak demand of power systems long-term operation planning
【24h】

Maximizing hydro share in peak demand of power systems long-term operation planning

机译:在电力系统的峰值需求中最大化水力分配长期运营计划

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents an improvement in the long-term hydrothermal system operation planning by including peak generation as a decision variable in the simulations, in order to better operate the hydro plants. Although this has been widely considered in the short-term, the objective is to correctly set the power system operation planning to avoid instantaneous shortages and blackouts. Thus, the instantaneous generation capacity is included in the objective function in order to better consider this variable in long-term operation planning. The results show that it is possible to significantly increase peak power by simply modifying the operation of hydro plants. Moreover, this approach does not present a significant increase in the operation costs. (C) 2016 Elsevier B.V. All rights reserved.
机译:本文通过将峰值发电作为决策变量包括在模拟中,以更好地运行水力发电厂,提出了长期水热系统运行计划的一项改进。尽管这在短期内已得到广泛考虑,但目的是正确设置电力系统的运行计划,以避免瞬时短缺和停电。因此,瞬时发电量包含在目标函数中,以便在长期运行计划中更好地考虑此变量。结果表明,只需修改水力发电厂的运行,就可以显着提高峰值功率。而且,这种方法不会显着增加运营成本。 (C)2016 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号